V0365/26
Checking status...
NavApproach Procedures

Instrument approach procedure changed for RNP RWY 07L minima.

2026-05-13 14:39 - 2026-06-08 23:59
Duration:27 days

Period of Applicability

2026-05-13 14:39 - 2026-06-08 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Instrument approach procedure changed for RNP RWY 07L. LNAV/VNAV DA minima increased to CAT A 456/800M 335 (300-800M), CAT B 466/900M 345 (300-900M), CAT C 475/900M 354 (300-900M), and CAT D 485/1000M 364 (400-1000M). Associated note changed: when ALS inop, increase CAT A RVR/VIS to 1500M, CAT BC to 1600M, and CAT D to 1700M. LNAV MDA minima increased to CAT AB 800/1500M 679 (700-1500M) and CAT CD 800-2400M 679 (700-2400M). Associated note unchanged.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0365/26 NOTAMN Q) EBBU/QPICH/I/BO/A/000/999/5053N00429E005 A) EBBR B) 2605131439 C) 2606082359 E) [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNP RWY 07L MINIMA INCREASE CHANGE LNAV/VNAV DA** CAT A 456/800M 335 (300-800M); CAT B 466/900M 345 (300-900M); CAT C 475/900M 354 (300-900M); CAT D 485/1000M 364 (400-1000M). CHANGE ASSOCIATED NOTE **WHEN ALS INOP, INCREASE CAT A RVR/VIS TO 1500M; CAT BC RVR/VIS TO 1600M; CAT D RVR/VIS TO 1700M. MINIMA INCREASE LNAV MDA*** CAT AB 800/1500M 679 (700-1500M); CAT CD 800-2400M 679 (700-2400M). ASSOCIATED NOTE *** UNCHANGED.​
Was this helpful?