A1646/26
PERM
Checking status...
ADTaxiway Operations

Break-aways 1 and 2 installed on TWY S19.

2026-04-02 11:05 - PERM
Duration:PERMANENT

Period of Applicability

2026-04-02 11:05 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Break-aways 1 and 2 are installed on taxiway S19; see AIP SUP IFR 03/26 for details.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1646/26 NOTAMN
Q) EDGG/QMXCS/IV/BO /A /000/999/5002N00834E005
A) EDDF B) 2604021105 C) PERM
E) BREAK-AWAYS 1 AND 2 INSTALLED ON TWY S19. REF AIP SUP IFR 03/26.
Was this helpful?