A3153/26
Checking status...
NavDeparture Procedures

SID procedures are changed due to OTT DVOR/DME maintenance.

2026-07-06 06:00 - 2026-07-08 13:00
Duration:VERY SHORTaggregated 21 hours

Period of Applicability

2026-07-06 06:00 - 2026-07-08 13:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Standard instrument departures are changed due to maintenance of OTT DVOR/DME. GPS/FMS RNAV overlays remain unchanged. RWY 08L OBAXA 2T requires BRNAV equipment after 6.8 DME DMN (7.7 DME DMS). RWY 08R OBAXA 2P requires BRNAV equipment after 5.6 DME DMS (5.0 DME DMN). RWY 26L/R OBAXA 6S, OBAXA 6N, and all SID with designator SIERRA, NOVEMBER, and WHISKEY via OTT require BRNAV equipment after passing 3700. Daily 0600-1300.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3153/26 NOTAMN
Q) EDMM/QPDCH/I /NBO/A /000/999/4821N01147E005
A) EDDM B) 2607060600 C) 2607081300
D) DAILY 0600-1300
E) CHANGES TO SID DUE TO MAINT OF OTT DVOR/DME:
GPS/FMS RNAV OVERLAYS REMAIN UNCHANGED:
RWY 08L: OBAXA 2T: AFTER 6.8 DME DMN (7.7 DME DMS) BRNAV EQUIPMENT
NECESSARY.
REF AIP PAGES AD 2 EDDM 5-7-3 EFF 12 AUG 2021, 5-7-7 DATED
02 OCT 2025.
RWY 08R: OBAXA 2P: AFTER 5.6 DME DMS (5.0 DME DMN) BRNAV EQUIPMENT
NECESSARY.
REF AIP PAGES AD 2 EDDM 5-7-15 EFF 12 AUG 2021, 5-7-19 DATED
27 NOV 2025.
RWY 26L/R: OBAXA 6S, OBAXA 6N AND ALL SID WITH DESIGNATOR SIERRA,
NOVEMBER AND WHISKEY VIA OTT: AFTER PASSING 3700 BRNAV EQUIPMENT
NECESSARY.
REF AIP PAGES AD 2 EDDM 5-7-27 EFF 12 AUG 2021, 5-7-31, 5-7-43
BOTH DATED 02 OCT 2025, 5-7-28, 5-7-28A BOTH EFF 02 JAN 2020,
5-7-39, 5-7-40 BOTH EFF 07 OCT 2021.
Was this helpful?