A1314/26
Checking status...
NavApproach Procedures

Operating minima for RWY 06 are increased due to a crane.

2026-06-08 12:32 - 2026-07-03 15:00
Duration:aggregated 9 days

Period of Applicability

2026-06-08 12:32 - 2026-07-03 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Operating minima OCA(OCH) for RWY 06 are changed due to a crane: LPV ACFT CAT A increased to 270(281), CAT B increased to 279(290), CAT C increased to 289(300), and CAT D-DL increased to 299(310). Ref AIP AD 2.EHAM IAC RNP RWY 06. Schedule MON-FRI 0500-1500.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1314/26 NOTAMN
Q) EHAA/QPOCH/I /NBO/A /000/999/5218N00446E005
A) EHAM B) 2606081232 C) 2607031500
D) MON-FRI 0500-1500
E) CHANGE OF OPERATING MINIMA OCA(OCH) RWY 06 DUE TO CRANE
LPV ACFT CAT A INCREASED TO 270(281), CAT B INCREASED TO 279(290),
CAT C INCREASED TO 289(300), CAT D-DL INCREASED 299(310).
REF AIP AD 2.EHAM IAC RNP RWY 06.)
Was this helpful?