A0751/26
Checking status...
NavApproach Procedures

EHAM RNP LPV RWY 04 OCA/OCH increased for categories A–D due to crane.

2026-03-30 05:00 - 2026-05-29 15:00
Duration:aggregated 19 days

Period of Applicability

2026-03-30 05:00 - 2026-05-29 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Operating minima OCA(OCH) for RNP LPV RWY 04 increased due to a crane: CAT A 254 (267), CAT B 267 (280), CAT C 275 (288), CAT D 285 (298). Applies Mon–Fri 0500–1500. Ref AIP AD2 EHAM IAC RNP RWY 04.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0751/26 NOTAMN
Q) EHAA/QPOCH/I /NBO/A /000/999/5218N00446E005
A) EHAM B) 2603300500 C) 2605291500
D) MON-FRI 0500-1500
E) CHANGE OF OPERATING MINIMA OCA(OCH) RWY 04 DUE TO CRANE.
RNP LPV CAT A-D INCREASED TO:
CAT A 254 (267), CAT B 267 (280),
CAT C 275 (288), CAT D 285 (298).
REF AIP AD2. EHAM IAC RNP RWY 04.
Was this helpful?