A0935/25
Checking status...
Taxiway Operations

Portion of taxiway link 2 between taxiway F1 and taxiway F2 closed.

2025-03-31 19:00 - 2025-04-05 04:30

Period of Applicability

2025-03-31 19:00 - 2025-04-05 04:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Portion of taxiway link 2 between taxiway F1 and taxiway F2 is closed daily from 19:00 to 04:30.

Message

PORTION OF TWY LINK 2 BETWEEN TWY F1 AND TWY F2 CLOSED

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0935/25 NOTAMN
Q) EISN/QMXXX/IV/BO /A /000/999/5325N00616W005
A) EIDW B) 2503311900 C) 2504050430
D) DAILY 1900-0430
E) PORTION OF TWY LINK 2 BETWEEN TWY F1 AND TWY F2 CLOSED
Issued at: 2025-03-27 19:08
Was this helpful?