A3330/24
Checking status...
Crane Operations

Runway 28R RNP IAP OCA(H) minima increased due erection of crane.

2024-12-17 10:52 - 2025-03-16 23:59

Period of Applicability

2024-12-17 10:52 - 2025-03-16 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 28R RNP Instrument Approach Procedure minimum obstacle clearance altitude increased due to erection of crane. Adjusted minimums for LNAV/VNAV: Category A: 610 feet (395 feet), Category B: 620 feet (405 feet), Category C: 630 feet (415 feet), Category D: 640 feet (425 feet). Refer to AIP EIDW AD 2.24-29 for more details.

Message

RWY 28R RNP IAP OCA(H) MINIMA INCREASED DUE ERECTION OF CRANE. LNAV/VNAV: CAT A: 610(395), CAT B: 620(405), CAT C: 630(415), CAT D: 640(425) REF AIP EIDW AD 2.24-29

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3330/24 NOTAMR A2477/24
Q) EISN/QPMCH/IV/NBO/A /000/999/5325N00616W005
A) EIDW B) 2412171052 C) 2503162359 EST
E) RWY 28R RNP IAP OCA(H) MINIMA INCREASED DUE ERECTION OF CRANE. 
LNAV/VNAV: CAT A: 610(395), CAT B: 620(405), CAT C: 630(415), 
CAT D: 640(425)
REF AIP EIDW AD 2.24-29
Issued at: 2024-12-17 10:52