Instrument approach procedures for non-RNAV 1 equipped/capable aircraft for runways 28R and 10L not available.
2025-02-24 09:20 - 2025-04-30 23:59
Period of Applicability
2025-02-24 09:20 - 2025-04-30 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Instrument approach procedures for non-RNAV 1 equipped or capable aircraft at EIDW for runways 28R and 10L are not available. Refer to AIP EIDW AD 2.22 Flight Procedures, Sections 2.3 and 2.4 for more details.
Message
INSTRUMENT APPROACH PROCEDURES FOR NON-RNAV 1 EQUIPPED/CAPABLE AIRCRAFT FOR RUNWAYS 28R AND 10L NOT AVAILABLE, REF AIP EIDW AD 2.22 FLIGHT PROCEDURES, SECTION 2.3 AND 2.4
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-02-24 09:20
Was this helpful?