A2482/25
Checking status...
Publication Updates

AIP update revises low-visibility procedures commencement and termination criteria at the aerodrome to more conservative thresholds.

2025-08-30 17:20 - 2025-11-28 23:59

Period of Applicability

2025-08-30 17:20 - 2025-11-28 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

AIP text for EPWA has been changed: low-visibility procedures (LVP) will commence when the touchdown zone RVR on the arrival runway falls below 800 m and/or any RVR falls below 550 m and/or the cloud ceiling falls to or below 300 ft. LVP will be terminated when the touchdown zone RVR on the arrival runway increases to 800 m or more and/or all RVR increase to 550 m or more and the cloud ceiling reaches 300 ft or more and a continuing improvement is anticipated. This replaces the previous criteria that commenced LVP when any RVR fell below 550 m and/or the cloud ceiling fell below 200 ft, and terminated when all RVR increased over 550 m and the cloud ceiling reached 200 ft or more with continuing improvement anticipated.

Message

REF AIP IFR AD 2 EPWA 1-50 - CHANGE OF INFORMATION IN POINTS: SHOULD BE: 7.1.2.1. LVP OPERATIONS WILL BE COMMENCED WHEN RVR TDZ ARR RWY FALLS BELOW 800M AND/OR ANY OF THE RVR FALLS BELOW 550 M AND/OR THE CLOUD CEILING FALLS TO OR BELOW 300 FT. 7.1.2.2. LVP WILL BE TERMINATED WHEN RVR TDZ ARR RWY INCREASE TO 800M OR MORE AND/OR ALL OF THE RVR INCREASE TO 550 M OR MORE AND THE CLOUD CEILING REACHES 300 FT OR MORE AND A CONTINUING IMPROVEMENT IS ANTICIPATED. INSTEAD OF: 7.1.2.1. LVP OPERATIONS WILL BE COMMENCED WHEN ANY OF THE RVR FALLS BELOW 550 M AND/OR THE CLOUD CEILING FALLS BELOW 200 FT. 7.1.2.2. LVP WILL BE TERMINATED WHEN ALL OF THE RVR INCREASE OVER 550 M AND THE CLOUD CEILING REACHES 200 FT OR MORE AND A CONTINUING IMPROVEMENT IS ANTICIPATED.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2482/25 NOTAMR A2450/25
Q) EPWW/QFAXX/IV/NBO/A /000/999/5210N02058E005
A) EPWA B) 2508301720 C) 2511282359 EST
E) REF AIP IFR AD 2 EPWA 1-50 - CHANGE OF INFORMATION IN POINTS:
SHOULD BE:
7.1.2.1. LVP OPERATIONS WILL BE COMMENCED WHEN RVR TDZ ARR RWY FALLS 
BELOW 800M AND/OR ANY OF THE RVR FALLS BELOW 550 M AND/OR THE CLOUD 
CEILING FALLS TO OR BELOW 300 FT.
7.1.2.2. LVP WILL BE TERMINATED WHEN RVR TDZ ARR RWY INCREASE TO 
800M OR MORE AND/OR ALL OF THE RVR INCREASE TO 550 M OR MORE AND THE 
CLOUD CEILING REACHES 300 FT OR MORE AND A CONTINUING IMPROVEMENT IS 
ANTICIPATED.
INSTEAD OF:
7.1.2.1. LVP OPERATIONS WILL BE COMMENCED WHEN ANY OF THE RVR FALLS 
BELOW 550 M AND/OR THE CLOUD CEILING FALLS BELOW 200 FT.
7.1.2.2. LVP WILL BE TERMINATED WHEN ALL OF THE RVR INCREASE OVER 
550 M AND THE CLOUD CEILING REACHES 200 FT OR MORE AND A CONTINUING 
IMPROVEMENT IS ANTICIPATED.
Issued 4 days ago
Was this helpful?