CLT SID takeoff minima for RWY 18C updated with temporary crane obstacles noted.

2026-03-30 14:52 - 2026-07-30 14:52
Duration:LONG5 months EST

Period of Applicability

2026-03-30 14:52 - 2026-07-30 14:52

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Charlotte/Douglas Intl (CLT), the CHARLOTTE THREE, KERMIT FOUR, and KNIGHTS THREE departures have updated takeoff minimums for RWY 18C and note temporary crane obstacles near the departure end; all other data remains as published, effective 2603301452 to 2607301452 EST.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZTL/undefined/NBO/A/000/999/3512N08057W005
A) KCLT
B) 2603280729
C) 2611070729EST
E) CLT CHARLOTTE/DOUGLAS INTL, CHARLOTTE, NC.
CHARLOTTE THREE DEPARTURE...
KERMIT FOUR DEPARTURE...
KNIGHTS THREE DEPARTURE...
TAKEOFF MINIMUMS: RWY 18C, 300-1 1/4 OR STANDARD WITH MINIMUM CLIMB OF 229 FT PER NM TO 1000 (2025-ASO-25005-OE, 2025-ASO-25617-OE).  TEMPORARY CRANE 858 MSL 5986FT SW OF DEPT END RWY 18C (2025-ASO-25005-OE).  TEMPORARY CRANE 852 MSL 5992FT S OF DEPT END RWY 18C (2025-ASO-25617-OE).  ALL OTHER DATA REMAINS AS PUBLISHED.