Period of Applicability
2026-04-27 18:43 - 2026-12-07 18:42
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
LAS takeoff minimums and obstacle departure procedures amended: RWY 26L standard with minimum climb 300 ft per NM to 2900; RWY 26R 500-2 3/4 or standard with minimum climb 295 ft per NM to 2900. Temporary cranes located 2.2 NM from DER on centerline (300 ft AGL/2680 ft MSL) and 1.2 NM from DER, 2100 ft left of centerline (112 ft AGL/2376 ft MSL). Add takeoff obstacle notes: RWY 19R sign 2136 ft from DER, 1029 ft right of centerline (70 ft AGL/2289 ft MSL); RWY 26L sign 4474 ft from DER, 880 ft left of centerline (70 ft AGL/2289 ft MSL). All other data remains as published.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?