6/9265
EST
Checking status...
NavDeparture Procedures

Runway 28 takeoff minimums and departure procedures are changed.

2026-06-18 18:52 - 2026-07-13 18:52
Duration:25 days EST

Period of Applicability

2026-06-18 18:52 - 2026-07-13 18:52

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Midland Intl Air and Space Port, Midland, TX. Takeoff minimums and departure procedures Amendment 1A are changed for runway 28. Takeoff minimums for runway 28 are 300-1 3/8 or standard with a minimum climb of 243 ft per NM to 3200, or alternatively with standard takeoff minimums and a normal 200 ft per NM climb gradient, takeoff must occur no later than 2100 ft prior to DER. Takeoff obstacle notes for runway 28 include temporary rigs beginning 1.05 NM from DER, beginning 2172 ft left of centerline, 175 AGL/3063 MSL (2026-ASW-3005/3006-OE). All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1267/26 NOTAMN Q) KZFW/QPOCH/I/NBO/A/000/999/3156N10212W005 A) KMAF B) 2606181852 C) 2607131852 E) ODP MIDLAND INTL AIR AND SPACE PORT, MIDLAND, TX. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 1A... TAKEOFF MINIMUMS: RWY 28, 300-1 3/8 OR STANDARD WITH MINIMUM CLIMB OF 243FT PER NM TO 3200, OR ALTERNATIVELY, WITH STANDARD TAKEOFF MINIMUMS AND A NORMAL 200FT PER NM CLIMB GRADIENT, TAKEOFF MUST OCCUR NO LATER THAN 2100FT PRIOR TO DER. TAKEOFF OBSTACLE NOTES: RWY 28, TEMPORARY RIGS, BEGINNING 1.05 NM FROM DER, BEGINNING 2172FT LEFT OF CENTERLINE, 175 AGL/3063 MSL (2026-ASW-3005/3006-OE). ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?