12/155
Checking status...
Construction Activity

Construction adjacent to South Terminal C Ramp apron with lighted and barricaded warning.

2024-12-31 15:19 - 2025-12-31 23:59

Period of Applicability

2024-12-31 15:19 - 2025-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Work will be in progress for construction adjacent to the South Terminal C Ramp apron at Orlando International Airport (MCO), with the area lighted and barricaded.

Message

APRON SOUTH TERMINAL C RAMP WIP CONST ADJ S SIDE LGTD AND BARRICADED 2412311519-2512312359

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

12/155 NOTAMR 
Q) KZJX/QMNHW/IV/BO/A/000/999/2825N08118W005 
A) KMCO 
B) 2412311519 
C) 2512312359 

E) SOUTH TERMINAL C RAMP WIP CONST ADJ S SIDE LGTD AND BARRICADED
Issued at: 2024-12-31 15:19