12/155
Checking status...
Apron Operations

South terminal C ramp under construction and barricaded.

2024-12-31 15:19 - 2025-12-31 23:59

Period of Applicability

2024-12-31 15:19 - 2025-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The south terminal C ramp is under construction, is barricaded, and is lit on the south side from December 31, 2024, 15:19 UTC to December 31, 2025, 23:59 UTC.

Message

APRON SOUTH TERMINAL C RAMP WIP CONST ADJ S SIDE LGTD AND BARRICADED 2412311519-2512312359

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

12/155 NOTAMR 
Q) KZJX/QMNHW/IV/BO/A/000/999/2825N08118W005 
A) KMCO 
B) 2412311519 
C) 2512312359 

E) SOUTH TERMINAL C RAMP WIP CONST ADJ S SIDE LGTD AND BARRICADED
Issued at: 2024-12-31 15:19
Was this helpful?