5/4416
Checking status...
Instrument Landing Systems

ILS or LOC approach amendment for runway 28R at Oakland International.

2025-06-13 19:38 - 2025-07-15 19:37

Period of Applicability

2025-06-13 19:38 - 2025-07-15 19:37

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

An amendment to the ILS or LOC approach for runway 28R at Oakland International Airport includes a decision altitude of 257 feet and a height above touchdown of 250 feet for all categories. Note: RVR of 1800 is authorized with the use of flight director, autopilot, or HUD to decision altitude. Temporary construction equipment may affect operations.

Message

IAP OAKLAND INTL, OAKLAND, CA. ILS OR LOC RWY 28R, AMDT 38... S-ILS 28R DA* 257/HAT 250 ALL CATS. DISREGARD NOTE: *RVR 1800 AUTHORIZED WITH USE OF FD OR AP OR HUD TO DA. TEMPORARY CONSTRUCTION EQUIPME...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZOA/QPIXX/I/NBO/A/000/999/3743N12213W005
A) KOAK
B) 2506131938
C) 2507151937EST
E) OAK OAKLAND INTL, OAKLAND, CA.
ILS OR LOC RWY 28R, AMDT 38...
S-ILS 28R DA* 257/HAT 250 ALL CATS. DISREGARD NOTE: *RVR 1800 AUTHORIZED WITH USE OF FD OR AP OR HUD TO DA. TEMPORARY CONSTRUCTION EQUIPMENT UP TO 36 MSL 754FT SE OF RWY 28R (2023-AWP-3809/3810-NRA).
Issued 21 days ago
Was this helpful?