03/964
NOTAM Active
Taxiway Operations

Work in progress on taxiway V2 at Chicago O'Hare Intl.

2025-03-26 09:16 - 2025-04-11 23:59

Period of Applicability

2025-03-26 09:16 - 2025-04-11 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is an open excavation adjacent to taxiway V2 on the east side. The area is lighted and barricaded for safety.

Message

TWY V2 BTN TWY V AND INTL TXL WIP OPN EXCAVATION ADJ EAST SIDE LGTD AND BARRICADED 2503260916-2504112359

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

03/964 NOTAMR 
Q) KZAU/QMXHW/IV/M/A/000/999/4158N08754W005 
A) KORD 
B) 2503260916 
C) 2504112359 

E) TWY V2 BTN TWY V AND INTL TXL WIP OPN EXCAVATION ADJ EAST SIDE LGTD AND BARRICADED
Issued at: 2025-03-26 09:16
Was this helpful?