01/334
Checking status...
Taxiway Operations

Work in progress with steel plates adjacent to taxiway A3 east side.

2025-01-31 15:46 - 2025-03-03 23:59

Period of Applicability

2025-01-31 15:46 - 2025-03-03 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Steel plates are present adjacent to taxiway A3, specifically between taxiways B and N, on the east side due to ongoing work.

Message

TWY A3 BTN TWY B AND TWY N WIP STEEL PLATES ADJ EAST SIDE 2501311546-2503032359

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

01/334 NOTAMR 
Q) KZAU/QMXHW/IV/M/A/000/999/4158N08754W005 
A) KORD 
B) 2501311546 
C) 2503032359 

E) TWY A3 BTN TWY B AND TWY N WIP STEEL PLATES ADJ EAST SIDE
Issued at: 2025-01-31 15:46