05/573
Checking status...
Taxiway Operations

Taxiway B between A14 and A15 is closed for excavation work.

2025-05-17 16:15 - 2025-06-14 23:00

Period of Applicability

2025-05-17 16:15 - 2025-06-14 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Taxiway B between Taxiway A14 and Taxiway A15 is under work in progress (WIP) due to excavation on the west side, which is lighted and barricaded. This work is scheduled from May 17, 2025, at 16:15 UTC to June 14, 2025, at 23:00 UTC.

Message

TWY B BTN TWY A14 AND TWY A15 WIP OPN EXCAVATION ADJ WEST SIDE LGTD AND BARRICADED 2505171615-2506142300

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

05/573 NOTAMN 
Q) KZAU/QMXHW/IV/M/A/000/999/4158N08754W005 
A) KORD 
B) 2505171615 
C) 2506142300 

E) TWY B BTN TWY A14 AND TWY A15 WIP OPN EXCAVATION ADJ WEST SIDE LGTD AND BARRICADED
Issued 2 months ago
Was this helpful?