Construction of a crane near Tampa International Airport.
Period of Applicability
2025-03-04 12:00 - 2025-08-31 21:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
A crane will be erected 0.8 NM southeast of Tampa International Airport, with a height of 160 feet above ground level and 180 feet above mean sea level. The area will be flagged and lighted, and the construction will occur daily from March 4, 2025, at 1200 UTC to August 31, 2025, at 2100 UTC.
Message
OBST CRANE (ASN UNKNOWN) 275749N0823134W (0.8NM SE TPA) 180FT (160FT AGL) FLAGGED AND LGTD DLY 1200-2100 2503041200-2508312100