A1621/25
Checking status...
Flow Control

Continuous descent experimentation for LFBO north arrivals is scheduled during specific times.

2025-04-01 22:00 - 2025-05-15 14:00

Period of Applicability

2025-04-01 22:00 - 2025-05-15 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Continuous descent experimentation (CDO) is being conducted in coordination with ACC below FL290 for north arrivals at LFBO, directing traffic towards 'NARAK' and then to 'BO'. The operation is scheduled from 2200 to 0400 and 1100 to 1400.

Message

CONTINUOUS DESCENT EXPERIMENTATION (CDO) IN COORDINATION WITH ACC BELOW FL290 FOR NORTH ARRIVAL LFBO IN DIRECTION OF 'NARAK': - RWY 14 : AFTER 'NARAK', PLAN DIRECT TOWARDS 'BO...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1621/25 NOTAMN
Q) LFBB/QPAXX/I /NBO/A /000/999/4338N00122E005
A) LFBO B) 2504012200 C) 2505151400
D) 2200-0400 1100-1400
E) CONTINUOUS DESCENT EXPERIMENTATION (CDO) IN COORDINATION WITH
ACC BELOW FL290 FOR NORTH ARRIVAL LFBO IN DIRECTION OF 'NARAK':
- RWY 14 : AFTER 'NARAK', PLAN DIRECT TOWARDS 'BO509'
- RWY 32 : AFTER 'NARAK', PLAN DIRECT TOWARDS 'BO605'
THESE TRAJECTORIES WILL BE CONFIRMED BY BORDEAUX ACC
AND/OR TOULOUSE APP. THE DIRECTS WITHOUT PASSING THROUGH THE POINT 
NARAK IS POSSIBLE AFTER COORDINATION. 
 OTHERWISE, THE CONTINUOUS DESCENT EXPERIMENTATION (CDO) IS POSSIBLE 
TOO BY DEFAULT OR/AND ON THE REQUEST OF THE PILOTE OR OF THE CONTROL 
FOR OTHER ARRIVALS TOWARDS LFBO INSIDE LFBO AIRSPACE.
Issued at: 2025-04-01 15:41
Was this helpful?