B3335/25
Checking status...
Approach Procedures

Minimum operational requirements for RNP RWY 25L specified including MOCA and decision altitudes.

2025-07-31 07:35 - 2025-10-31 23:59

Period of Applicability

2025-07-31 07:35 - 2025-10-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The minimum operational requirements for the RNP RWY 25L have been specified, including the minimum obstacle clearance altitude (MOCA) and decision altitudes (DA) for various aircraft categories.

Message

RNP RWY 25L MNM OPR - REF AD2 LFRB IAC RWY25L FNA RNP: - INTERMEDIATE SEGMENT: MOCA(H) 1570(1258) - LNAV-VNAV MNM: CAT DA(H) RVR OCH A 650(340) 800 333 B 660(350) 900 345 C 670(360) 900 353 D 680(370) 1000 363

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B3335/25 NOTAMR B1748/25
Q) LFRR/QPICH/I /NBO/A /000/999/4827N00425W005
A) LFRB B) 2507310735 C) 2510312359
E) RNP RWY 25L MNM OPR - REF AD2 LFRB IAC RWY25L FNA RNP:
- INTERMEDIATE SEGMENT: MOCA(H) 1570(1258)
- LNAV-VNAV MNM:
CAT   DA(H)    RVR   OCH
A   650(340)  800   333
B   660(350)  900   345
C   670(360)  900   353
D   680(370)  1000  363
Issued 11 days ago
Was this helpful?