B0726/25
Checking status...
Taxiway Operations

Runway guard lights installed on taxiway links A1, A2 and operating in test mode.

2025-04-12 07:51 - 2025-06-30 23:59

Period of Applicability

2025-04-12 07:51 - 2025-06-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway guard lights have been installed on taxiway links A1 and A2 and are currently operating in test mode.

Message

RWY GUARD LGT INSTL ON TWY LINKS A1, A2 AND OPR ON TEST MODE.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B0726/25 NOTAMN
Q) LGGG/QLYXX/IV/M  /A /000/999/3726N02521E005
A) LGMK B) 2504120751 C) 2506302359
E) RWY GUARD LGT INSTL ON TWY LINKS A1, A2 AND OPR ON TEST MODE.
Issued at: 2025-04-12 07:51
Was this helpful?