A4689/25
Checking status...
Runway Operations

Runway 17R/35L is closed due to work in progress; runway 17L/35R is open.

2025-08-12 22:00 - 2025-08-13 03:30

Period of Applicability

2025-08-12 22:00 - 2025-08-13 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 17R/35L is closed due to work in progress, while runway 17L/35R remains open. The lighting system for runway 17R/35L is currently under test, and runway 17R/35L will be crossed on a tactical basis. Refer to AIP AD 2 LIMC 2-1 for more information.

Message

RWY 17R/35L CLSD DUE TO WIP RWY 17L/35R OPN RMK: LGT SYSTEM RWY 17R/35L ON TEST XNG RWY 17R/35L ON TACTICAL BASIS REF AIP AD 2 LIMC 2-1

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LIMM/QMRXX/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2508122200 C) 2508130330
E) RWY 17R/35L CLSD DUE TO WIP
RWY 17L/35R OPN
RMK: LGT SYSTEM RWY 17R/35L ON TEST
XNG RWY 17R/35L ON TACTICAL BASIS
REF AIP AD 2 LIMC 2-1
Issued 19 days ago
Was this helpful?