A1464/25
NOTAM Active
Runway Operations

RWY 17R/35L closed due to work in progress; RWY 17L/35R open.

2025-03-17 23:00 - 2025-03-19 05:00

Period of Applicability

2025-03-17 23:00 - 2025-03-19 05:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 17R/35L at LIMC is closed due to work in progress, while Runway 17L/35R remains open. During daytime operations, departures from RWY 17L are not permitted if RWY 35R is unusable for operational conditions, and all taxiways will be crossed on a tactical basis.

Message

RWY 17R/35L CLSD DUE TO WIP RWY 17L/35R OPEN RMK: DURING DAYTIME SCHEME, DEPARTURES FROM RWY 17L NOT PERMITTED IF RWY 35R UNUSABLE FOR OPERATIONAL CONDITIONS. CROSSING ALL TWY ON TACTICAL BASIS. REF A...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1464/25 NOTAMN
Q) LIMM/QMRLC/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2503172300 C) 2503190500
E) RWY 17R/35L CLSD DUE TO WIP
RWY 17L/35R OPEN
RMK: DURING DAYTIME SCHEME, DEPARTURES FROM RWY 17L NOT PERMITTED IF
RWY 35R UNUSABLE FOR OPERATIONAL CONDITIONS.
CROSSING ALL TWY ON TACTICAL BASIS.
REF AIP AD 2 LIMC 1-29 AND 2-1
Issued at: 2025-03-14 17:50
Was this helpful?