A5850/25
Checking status...
Runway Operations

Runway 17R/35L is closed for work with lighting on test and crossing allowed on a tactical basis.

2025-10-11 22:00 - 2025-10-12 03:30

Period of Applicability

2025-10-11 22:00 - 2025-10-12 03:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 17R/35L is closed due to work in progress; crossing of RWY 17R/35L is permitted on a tactical basis, and the RWY 17R/35L lighting system is on test. Runway 17L/35R remains open.

Message

RWY 17R/35L CLSD DUE TO WIP RWY 17L/35R OPEN RMK: LGT SYSTEM RWY 17R/35L ON TEST, CROSSING RWY 17R/35L ON TACTICAL BASIS REF AIP AD 2 LIMC 2-1

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) LIMM/QMRXX/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2510112200 C) 2510120330
E) RWY 17R/35L CLSD DUE TO WIP
RWY 17L/35R OPEN
RMK: LGT SYSTEM RWY 17R/35L ON TEST,
CROSSING RWY 17R/35L ON TACTICAL BASIS
REF AIP AD 2 LIMC 2-1
Issued about 15 hours ago
Was this helpful?