Period of Applicability
2026-05-11 05:00 - 2026-08-08 16:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
A new mobile crane is operating as a temporary obstacle penetrating the transitional and approach surfaces to RWY 12, moving within the specified area, with a maximum elevation of 35.9 m AGL (48.4 m AMSL) and an 8.0 m rotating jib; ICAO obstacle signal provided. Schedule: daily 0500–1600.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?