A2084/25
Checking status...
Approach Procedures

The graphical depiction of the nominal track from NDB GBG for the instrument approach is inaccurate and shows an incorrect joining point to the DME arc.

2025-08-29 06:43 - 2025-09-03 23:59

Period of Applicability

2025-08-29 06:43 - 2025-09-03 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The graphical depiction of the nominal track from NDB GBG on the LOWG AIP maps is inaccurate; the actual nominal track is QDR 240 from NDB GBG and leads to joining the DME arc at D‑12 GRZ on R‑115 GRZ. The correction will be incorporated in AIP Austria with effect from 04 Sep 2025.

Message

REF AIP AUSTRIA, LOWG AD 2 MAP 13-1-2 AND LOWG AD 2 MAP 13-4-2 GRAPHICAL DEPICTION OF NOMINAL TRACK FROM NDB GBG INACCURATE. ACTUAL NOMINAL TRACK ON QDR 240 FROM NDB GBG LEADS TO JOINING THE DME ARC AT D-12 GRZ ON R-115 GRZ. WILL BE INCORPORATED IN AIP AUSTRIA WEF 04 SEP 2025

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2084/25 NOTAMR A1510/25
Q) LOVV/QPIXX/I /BO /A /000/999/4700N01526E005
A) LOWG B) 2508290643 C) 2509032359
E) REF AIP AUSTRIA, LOWG AD 2 MAP 13-1-2 AND LOWG AD 2 MAP 13-4-2
GRAPHICAL DEPICTION OF NOMINAL TRACK FROM NDB GBG INACCURATE. ACTUAL 
NOMINAL TRACK ON QDR 240 FROM NDB GBG LEADS TO JOINING THE DME ARC 
AT D-12 GRZ ON R-115 GRZ.
WILL BE INCORPORATED IN AIP AUSTRIA WEF 04 SEP 2025
Issued 5 days ago
Was this helpful?