The graphical depiction of the nominal track from NDB GBG for the instrument approach is inaccurate and shows an incorrect joining point to the DME arc.
2025-08-29 06:43 - 2025-09-03 23:59
Period of Applicability
2025-08-29 06:43 - 2025-09-03 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The graphical depiction of the nominal track from NDB GBG on the LOWG AIP maps is inaccurate; the actual nominal track is QDR 240 from NDB GBG and leads to joining the DME arc at D‑12 GRZ on R‑115 GRZ. The correction will be incorporated in AIP Austria with effect from 04 Sep 2025.
Message
REF AIP AUSTRIA, LOWG AD 2 MAP 13-1-2 AND LOWG AD 2 MAP 13-4-2 GRAPHICAL DEPICTION OF NOMINAL TRACK FROM NDB GBG INACCURATE. ACTUAL NOMINAL TRACK ON QDR 240 FROM NDB GBG LEADS TO JOINING THE DME ARC AT D-12 GRZ ON R-115 GRZ. WILL BE INCORPORATED IN AIP AUSTRIA WEF 04 SEP 2025
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued 5 days ago
Was this helpful?