Period of Applicability
2024-10-20 08:42 - 2025-01-20 14:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Mobile cranes are present at the transition surface of runway 17R/35L with specified coordinates and an elevation at the top of 130 meters. The cranes have red obstacle lights.
Map Visualization
Loading map data