A0360/25
Checking status...
Lighting Systems

Preventive maintenance of PAPI RWY 04 and RWY 22.

2025-03-25 10:00 - 2025-03-25 15:00

Period of Applicability

2025-03-25 10:00 - 2025-03-25 15:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Preventive maintenance is being conducted on the PAPI for runway 04 and runway 22, with staff and two vehicles present on the runway. They are in permanent contact with the tower on 118.100 MHz and the runway will be vacated within 5 minutes when required.

Message

PREVENTIVE MAINTENANCE OF PAPI RWY 04 AND PAPI RWY 22 PRESENCE OF STAFF AND 2 VEHICLES ON RWY, IN PERMANENT CONTACT WITH TWR ON 118.100MHZ. RWY VACATED WITHIN 5 MIN. THE FRENCH VERSION OF THIS NOTAM...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0360/25 NOTAMN
Q) NTTT/QLPXX/IV/M/A/000/999/1733S14936W005
A) NTAA
B) 2503251000 C) 2503251500
E) PREVENTIVE MAINTENANCE OF PAPI RWY 04 AND PAPI RWY 22
PRESENCE OF STAFF AND 2 VEHICLES ON RWY, IN PERMANENT 
CONTACT WITH TWR ON 118.100MHZ.
RWY VACATED WITHIN 5 MIN.

THE FRENCH VERSION OF THIS NOTAM IS C0718/25
Issued at: 2025-03-21 22:51
Was this helpful?