Strip grading work is ongoing on the left side of runway 34R.
2025-05-07 14:30 - 2025-08-06 11:00
Period of Applicability
2025-05-07 14:30 - 2025-08-06 11:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
There is strip grading work in progress on the left side of runway 34R, affecting the area from 500 meters to 4200 meters from the runway threshold, with a depth of 1.5 meters and machinery operating at a height of 20 feet.
Message
STRIP GRADING EXIST ON LEFT SIDE OF RWY 34R, WITH FLW SPECIFICATIONS: DIST FM THR RWY 34R: 500 M UP TO 4200 M, DIST FM RCL 34R: 60 M UP TO 170 M, DPT: 1.5 M, MACHINERY OPR WITH HGT OF 20 FT AND WILL V...
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-05-07 14:31
Was this helpful?