Change of instrument approach procedure for ILS or LOC RWY 26 at Muwaffaq Salti Ab.
2025-04-16 23:59 - 2025-07-09 23:59
Period of Applicability
2025-04-16 23:59 - 2025-07-09 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
The instrument approach procedure for ILS or LOC RWY 26 at OJMS is changed. When the ALS is inoperative, the visibility requirements for various categories are increased significantly.
Message
[US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED ILS OR LOC RWY 26 S-LOC 26** CAT ABCDE 2080-1200M 405(400-1200M). **WHEN ALS INOP, INCREASE LOC CAT ABC VIS TO 1900M, CAT DE VIS TO 2000M. CIRCLING CAT AB 2310-2700M 591(600-2700M); CAT C 2520-3800M 801(900-3800M); CAT D 2630-4800M 911(1000-4800M); CAT E 2730-4900M 1011(1100-4900M).
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Issued at: 2025-04-16 17:00
Was this helpful?