V0075/25
Checking status...
Departure Procedures

IFR take-off minimums and obstacle departure procedures for runway 08 changed; specific obstacles detailed.

2025-05-07 15:22 - 2025-07-09 23:59

Period of Applicability

2025-05-07 15:22 - 2025-07-09 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

IFR take-off minimums and obstacle departure procedures for runway 08 have been changed, detailing specific obstacles and their locations relative to the runway.

Message

[US DOD PROCEDURAL NOTAM] IFR TAKE-OFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES CHANGED OMNIDIRECTIONAL DEPARTURE RWY 08 TAKEOFF OBSTACLES: TERRAIN 0’ FROM DER 492’ RIGHT OF CENTERLINE, 1686’ MSL. AIRCRAFT OVERFLOW PARKING 1,228 FROM DER 513’ LEFT OF CENTERLINE, 55’ AGL/1734’ MSL. 1725’ MSL. RADAR ANTENNA 1512’ FROM DER 334’ LEFT OF CENTERLINE, 72’ AGL/1742’ MSL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0075/25 NOTAMN 
Q) OJAC/QPICH/I/BO/A/000/999/3149N03646E005 
A) OJMS 
B) 2505071522 
C) 2507092359 
E) [US DOD PROCEDURAL NOTAM] IFR TAKE-OFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES CHANGED OMNIDIRECTIONAL DEPARTURE RWY 08 TAKEOFF OBSTACLES: TERRAIN 0’ FROM DER 492’ RIGHT OF CENTERLINE, 1686’ MSL. AIRCRAFT OVERFLOW PARKING 1,228 FROM DER 513’ LEFT OF CENTERLINE, 55’ AGL/1734’ MSL. 1725’ MSL. RADAR ANTENNA 1512’ FROM DER 334’ LEFT OF CENTERLINE, 72’ AGL/1742’ MSL.
Issued at: 2025-05-07 15:22
Was this helpful?