M0282/25
Checking status...
ADAIRPORT_MAINTENANCE

Airfield closed to all operations during specific times.

2025-02-21 05:30 - 2025-03-02 15:30
Duration:10 days

Period of Applicability

2025-02-21 05:30 - 2025-03-02 15:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Airfield will be closed to all air and ground operations from 02 March 0900Z to 02 March 1530Z. Normal operations resume at 02 March 1530Z. SAR and emergency aircraft may be exempt.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0282/25 NOTAMN 
Q) ZUA/QXXXX/IV/NBO/A/000/999/1335N14455E005 
A) PGUA 
B) 2502210530 
C) 2503021530 
E) AIRFIELD CLOSED TO ALL AIR AND GROUND OPERATIONS FROM 02 MAR 1900L (02 MAR 0900Z) ALL AFLD ACTIVITY WILL CEASE AND ALL PERSONNEL MUST EXIT AIRFIELD NLT POSTED CLOSURE START TIME. NORMAL OPERATIONS RESUME AT: 03 MAR 0130L (02 MAR 1530Z). SAR & EMERGENCY ACFT ONLY MAY BE EXEMPT.
Was this helpful?