M1550/25
Checking status...
Runway Operations

Airfield closure for all operations from 21 August 1830L to 21 August 2130L.

2025-08-07 01:08 - 2025-08-21 11:30

Period of Applicability

2025-08-07 01:08 - 2025-08-21 11:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The airfield will be closed to all air and ground operations starting from 21 August at 1830 local time, with normal operations resuming at 21 August at 2130 local time. All personnel must exit the airfield by the closure start time, with exemptions for SAR and emergency aircraft.

Message

AIRFIELD CLOSED TO ALL AIR AND GROUND OPERATIONS AT 21 AUG 1830L (21 AUG 0830Z). ALL AFLD ACTIVITY WILL CEASE AND ALL PERSONNEL MUST EXIT AIRFIELD NLT POSTED CLOSURE START TIME. NORMAL OPERATIONS RESUME AT: 21 AUG 2130L (21 AUG 1130Z). SAR & EMERGENCY ACFT ONLY MAY BE EXEMPT.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1550/25 NOTAMN 
Q) ZUA/QXXXX/IV/NBO/A/000/999/1335N14455E005 
A) PGUA 
B) 2508070108 
C) 2508211130 
E) AIRFIELD CLOSED TO ALL AIR AND GROUND OPERATIONS AT 21 AUG 1830L (21 AUG 0830Z). ALL AFLD ACTIVITY WILL CEASE AND ALL PERSONNEL MUST EXIT AIRFIELD NLT POSTED CLOSURE START TIME. NORMAL OPERATIONS RESUME AT: 21 AUG 2130L (21 AUG 1130Z). SAR & EMERGENCY ACFT ONLY MAY BE EXEMPT.
Issued 6 days ago
Was this helpful?