F0901/25
Checking status...
Crane Operations

A crane exists above the horizontal surface near Fukuoka City, affecting instrument approach and departure procedures.

2025-07-03 23:00 - 2025-08-06 08:00

Period of Applicability

2025-07-03 23:00 - 2025-08-06 08:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

A crane is present above the horizontal surface at the specified position near Fukuoka City, affecting instrument approach and departure procedures. The crane is scheduled to be in place from 2300 to 0800.

Message

CRANE EXIST ABV HORIZONTAL SFC 1.PSN : 333507.0N1302531.0E (QTE/272DEG 2451M FM RJFF ARP) (FUKUOKA-SHI) 2.NUMBER : 1 3.RMK : (1)WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CH...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

F0901/25 NOTAMN
Q) RJJJ/QOBCE/IV/M/A/000/003/3335N13027E005
A) RJFF B) 2507032300 C) 2508060800
D) 2300/0800
E) CRANE EXIST ABV HORIZONTAL SFC
1.PSN    : 333507.0N1302531.0E
           (QTE/272DEG 2451M FM RJFF ARP)
           (FUKUOKA-SHI)
2.NUMBER : 1
3.RMK    : (1)WX MNM, INSTRUMENT APCH PROC, DEP PROC NO CHANGE
           (2)OBST LGT AND OBST DAY MARKING INSTL
           (3)THIS NOTAM WILL BE INCORPORATED IN SUP
F) SFC G) 206FT AMSL
Issued about 1 month ago
Was this helpful?