B2446/25
Checking status...
Instrument Landing Systems

ILS CAT I for runway 02/20 is on test and not available for use.

2025-06-07 02:36 - 2025-09-07 08:00

Period of Applicability

2025-06-07 02:36 - 2025-09-07 08:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS CAT I for runway 02/20 is currently undergoing testing and should not be used until flight check verification is completed.

Message

ILS CAT I RWY 02/20 ON TEST, DO NOT USE (AWAITING FLTCK VERIFICATION).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B2446/25 NOTAMR B0841/25
Q) RPHI/QISCT/I /NBO/A /000/999/1511N12034E005
A) RPLC B) 2506070236 C) 2509070800 EST
E) ILS CAT I RWY 02/20 ON TEST, DO NOT USE (AWAITING FLTCK 
VERIFICATION).
Issued at: 2025-06-07 02:38
Was this helpful?