A1396/25
Checking status...
Airspace Restrictions

Temporary airspace restriction for PJE operations over the Pentagonito zone.

2025-04-23 12:00 - 2025-04-27 23:00

Period of Applicability

2025-04-23 12:00 - 2025-04-27 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Temporary airspace restriction for PJE operations over the Pentagonito zone between 7-9 nautical miles from JCL DVOR, requiring prior coordination with Lima ACC and Lima Tower. The operation is scheduled from 1200 to 2300.

Message

TRA DUE PJE OVER SPR91 PENTAGONITO ZONE BTN 07-09 NM RDL 110-126 FM JCL DVOR. PREVIOUS COOR WITH LIMA ACC AND LIMA TWR IS REQUIRED. COORD: 120608S0765908W RDO: 01 NM F) 4000 FT G) FL120

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1396/25 NOTAMN
Q) SPIM/QRALW/IV/NBO/W/040/120/1206S07659W001
A) SPJC B) 2504231200 C) 2504272300
D) 1200-2300
E) TRA DUE PJE OVER SPR91 PENTAGONITO ZONE BTN 07-09 NM RDL 110-126 FM
JCL DVOR. PREVIOUS COOR WITH LIMA ACC AND LIMA TWR IS REQUIRED.
COORD: 120608S0765908W     RDO: 01 NM
F) 4000 FT G) FL120
Issued at: 2025-04-16 01:23
Was this helpful?