A0386/25
Checking status...
Communication Equipment Status

Limited visibility from new ATC tower requires pilot position reports and compliance with specific clearance limits.

2025-01-30 13:25 - 2025-02-28 23:59

Period of Applicability

2025-01-30 13:25 - 2025-02-28 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Due to limited visibility from the new ATC tower, controllers rely solely on pilot position reports. Pilots must comply with ATC and SDP clearance limits at intermediate holding points for transfer gates A1, D1, D2, and F1.

Message

DUE TO LTD VIS FROM NEW ATC TWR CONTROLLERS ARE SOLELY DEPENDANT ON PILOT PSN REP. PILOTS ARE REQUIRED TO COMPLY WITH ATC/SDP CLEARANCE LIMITS ON INTERMEDIATE HOLDING POINTS OF TRANSFER GATES A1, D1, ...

Map Visualization

Preview
Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0386/25 NOTAMN
Q) SPIM/QSTLT/IV/NBO/A/000/999/
A) SPJC B) 2501301325 C) 2502282359
E) DUE TO LTD VIS FROM NEW ATC TWR CONTROLLERS ARE SOLELY DEPENDANT ON
PILOT PSN REP. PILOTS ARE REQUIRED TO COMPLY WITH ATC/SDP CLEARANCE
LIMITS ON INTERMEDIATE HOLDING POINTS OF TRANSFER GATES A1, D1, D2
AND F1.
Issued at: 2025-01-30 13:24