A1207/25
Checking status...
Airspace Restrictions

Limited visibility affecting ATC operations at SPJC.

2025-04-01 00:00 - 2025-04-30 23:59

Period of Applicability

2025-04-01 00:00 - 2025-04-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Due to limited visibility from the new ATC tower, controllers are solely dependent on pilot position reports. Pilots are required to comply with ATC/SDP clearance limits at intermediate holding points of transfer gates A1, D1, D2, and F1.

Message

DUE TO LTD VIS FROM NEW ATC TWR CONTROLLERS ARE SOLELY DEPENDENT ON PILOT PSN REP. PILOTS ARE REQUIRED TO COMPLY WITH ATC/SDP CLEARANCE LIMITS ON INTERMEDIATE HOLDING POINTS OF TRANSFER GATES A1, D1, ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1207/25 NOTAMN
Q) SPIM/QSTLT/IV/NBO/A/000/999/
A) SPJC B) 2504010000 C) 2504302359
E) DUE TO LTD VIS FROM NEW ATC TWR CONTROLLERS ARE SOLELY DEPENDENT ON
PILOT PSN REP. PILOTS ARE REQUIRED TO COMPLY WITH ATC/SDP CLEARANCE
LIMITS ON INTERMEDIATE HOLDING POINTS OF TRANSFER GATES A1, D1, D2
AND F1
Issued at: 2025-03-31 17:17
Was this helpful?