A0419/25
Checking status...
Airspace Restrictions

Blasting activity will take place near the southwest area of the aerodrome.

2025-08-07 15:00 - 2025-08-28 16:00

Period of Applicability

2025-08-07 15:00 - 2025-08-28 16:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Blasting activity will take place near the southwest area of the aerodrome between 1500 and 1600 hours UTC. The contractor will coordinate with CAP OPS and ATC 30 minutes before blasting. Normal operations will resume after the area is clear. For additional information, contact CAP OPS at +59998391030. Scheduled blasting times are on August 7, 14, 21, and 28 from 1500 to 1600 UTC.

Message

AS INDICATED IN AIP SUP 10/20, BLASTING ACT WILL TAKE PLACE NEAR THE SOUTH WEST AREA OF THE AD, BTN 1500 AND 1600 HOURS UTC. 30 MIN BEFORE BLASTING, CONTRACTOR WILL COORDINATE WITH CAP OPS AND ATC. AFTER BLASTING HAS TAKEN PLACE AND ALL IS CLR, RESUME NORMAL OPERATION. FOR ADDN INFO PLEASE CTC CAP OPS AT +5999 8391030.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) TNCF/QWHLW/IV/M/AW/000/999/1211N06857W005
A) TNCC
B) 2508071500 C) 2508281600
D) AUG 07 1500-1600
AUG 14 1500-1600
AUG 21 1500-1600
AUG 28 1500-1600
E) AS INDICATED IN AIP SUP 10/20, BLASTING ACT WILL TAKE PLACE
NEAR THE SOUTH WEST AREA OF THE AD, BTN 1500 AND 1600 HOURS UTC. 
30 MIN BEFORE BLASTING, CONTRACTOR WILL COORDINATE WITH
CAP OPS AND ATC. AFTER BLASTING HAS TAKEN PLACE AND ALL IS
CLR, RESUME NORMAL OPERATION. FOR ADDN INFO PLEASE CTC 
CAP OPS AT +5999 8391030.
F) SFC G) UNL
Issued 20 days ago
Was this helpful?