Construction Activity

Digging work in progress from taxiway A northwards; equipment up to 3.5m height operating.

2025-01-17 05:40 - 2025-04-20 23:59

Period of Applicability

2025-01-17 05:40 - 2025-04-20 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Digging work is underway from taxiway A heading northwards at a distance of 140m east of the runway centerline 01/19, with equipment up to 3.5 meters in height.

Message

DIGGING WIP FM TWY A NORTHWARDS AT DIST 140M EAST OF RCL 01/19. EQPT UP TO 3.5M HGT OPR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0311/25 NOTAMR A7229/24
Q) UHHH/QFAHW/IV/NBO/A/000/999/4653N14243E005
A) UHSS B) 2501170540 C) 2504202359 EST
E) DIGGING WIP FM TWY A NORTHWARDS AT DIST 140M EAST OF RCL 01/19.
EQPT UP TO 3.5M HGT OPR.