A6450/25
Checking status...
Construction Activity

Construction work and equipment erected near runway 19 threshold creating a potential obstacle hazard.

2025-08-25 22:40 - 2025-11-25 21:00

Period of Applicability

2025-08-25 22:40 - 2025-11-25 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Digging work in progress northeast of runway 19 threshold with equipment erected; mobile equipment up to 3.5 m high located about 400 m and 25 m from the runway centreline extended towards north, creating a potential obstacle hazard.

Message

DIGGING WIP NE OF RWY 19 THR, AT DIST 400M AND 25M FROM EXTENDED RCL TOWARDS N. EQPT HGT UP TO 3.5M OPR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A6450/25 NOTAMR A3630/25
Q) UHHH/QOBCE/IV/M/A/000/999/4653N14243E005
A) UHSS B) 2508252240 C) 2511252100 EST
E) DIGGING WIP NE OF RWY 19 THR, AT DIST 400M AND 25M FROM EXTENDED
RCL TOWARDS N. EQPT HGT UP TO 3.5M OPR.
Issued 24 days ago
Was this helpful?