Construction work and equipment erected near runway 19 threshold creating a potential obstacle hazard.
2025-08-25 22:40 - 2025-11-25 21:00
Period of Applicability
2025-08-25 22:40 - 2025-11-25 21:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Digging work in progress northeast of runway 19 threshold with equipment erected; mobile equipment up to 3.5 m high located about 400 m and 25 m from the runway centreline extended towards north, creating a potential obstacle hazard.
Message
DIGGING WIP NE OF RWY 19 THR, AT DIST 400M AND 25M FROM EXTENDED RCL TOWARDS N. EQPT HGT UP TO 3.5M OPR.