A3630/25
Checking status...
Runway Operations

Ongoing digging work northeast of runway 19 threshold, affecting operations.

2025-05-26 00:20 - 2025-08-25 21:00

Period of Applicability

2025-05-26 00:20 - 2025-08-25 21:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is ongoing digging work northeast of runway 19 threshold, located 400 meters from the threshold and 25 meters from the extended runway centerline towards the north. Equipment height may reach up to 3.5 meters.

Message

DIGGING WIP NE OF RWY 19 THR, AT DIST 400M AND 25M FROM EXTENDED RCL TOWARDS N. EQPT HGT UP TO 3.5M OPR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A3630/25 NOTAMR A0980/25
Q) UHHH/QOBCE/IV/M/A/000/999/4653N14243E005
A) UHSS B) 2505260020 C) 2508252100 EST
E) DIGGING WIP NE OF RWY 19 THR, AT DIST 400M AND 25M FROM EXTENDED
RCL TOWARDS N. EQPT HGT UP TO 3.5M OPR.
Issued about 2 months ago
Was this helpful?