A2969/25
Checking status...
Runway Operations

Ongoing digging work 125 meters east of runway 01/19 centerline.

2025-04-30 02:30 - 2025-07-30 23:59

Period of Applicability

2025-04-30 02:30 - 2025-07-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is ongoing digging work 125 meters east of runway 01/19 centerline on the segment between taxiway B and taxiway D. Equipment height is up to 3.5 meters operational.

Message

DIGGING WIP 125M EAST OF RWY 01/19 CL ON SEGMENT BETWEEN TWY B AND TWY D. EQPT UP TO 3.5M HGT OPR.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2969/25 NOTAMR A0519/25
Q) UHHH/QMAHW/IV/B/A/000/999/4653N14243E005
A) UHSS B) 2504300230 C) 2507302359 EST
E) DIGGING WIP 125M EAST OF RWY 01/19 CL ON SEGMENT BETWEEN TWY B
AND TWY D. EQPT UP TO 3.5M HGT OPR.