A6014/25
Checking status...
Runway Operations

Digging work east of runway 01/19 is ongoing.

2025-08-10 00:27 - 2025-11-30 23:59

Period of Applicability

2025-08-10 00:27 - 2025-11-30 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

There is ongoing digging work east of runway 01/19, located 159 meters from the runway centerline and 76 meters south of taxiway D centerline. Equipment up to 3.5 meters in height is being used.

Message

DIGGING WIP EAST OF RWY 01/19 AT DIST 159M FROM RCL AND 76M S OF TWY D CL. EQPT UP TO 3.5M HGT EMPLOYED.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A6014/25 NOTAMR A3292/25
Q) UHHH/QFAHW/IV/NBO/A/000/999/4653N14243E005
A) UHSS B) 2508100027 C) 2511302359 EST
E) DIGGING WIP EAST OF RWY 01/19 AT DIST 159M FROM RCL AND 76M S OF
TWY D CL. EQPT UP TO 3.5M HGT EMPLOYED.
Issued about 1 month ago
Was this helpful?