Period of Applicability
2026-04-27 02:19 - 2026-07-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Due to TWY C reconstruction: TWY C and the main taxiway segment from stands 5 to TWY B are closed with a construction fence obstacle up to 2 m abeam stand 5; stands 1, 3, and 5 are closed; stands 2, 4, and 6 available for through taxiing only; stands 7 and 8 require specific taxi/tow procedures (taxi in under own power on magnetic bearing 117°, tow out; or tow in on 297°, engine shutdown on main TWY abeam stand 7, taxi out under own power); access to stands 12, 12A, 13–22, 33, 34, 35, 35A, 35B via TWY D requires towing through stands 2, 4, 6; TWY B is available only for YAK-40, MI-8 and lighter aircraft during daylight with visibility 1000 m or more.