Period of Applicability
2026-04-27 02:34 - 2026-07-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
Interpretation
Work in progress on the runway: RWY 30 threshold displaced 360 m toward ARP with construction equipment up to 4.0 m on the closed segment (equipment removed during aircraft takeoff/landing); runway operational dimensions 2800 m x 60 m; strengthened RWY strip 150 m x 60 m before THR 30; aircraft turning at TWY A junction prohibited—turn within runway width only; displaced-threshold day markings provided; RWY 30 lighting available for takeoff only and approach/crossbar lights off; ILS unserviceable; RWY 12 available H24 for takeoff/landing with TORA/TODA/ASDA/LDA 2800 m; RWY 30 available H24 for takeoff and for landing only by day with visibility over 2000 m, with TORA 2800 m, TODA 2800 m, ASDA 2875 m, LDA 2800 m; RWY 30 approaches available: VFR, visual, and NDB (LOM) with specified intercept and crossing altitudes/distances.