Period of Applicability
2026-06-30 09:00 - 2026-09-30 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Due to limited quantity of TS-1 fuel, refueling of non-scheduled aircraft is provided strictly by PPR, refueling is not provided for aircraft available as an alternate aerodrome, airlines planning flights to UIBB aerodrome shall provide the maximum assumed quantity of fuel for the return departure, and refuelling of TC-1 above the stated limit is carried out strictly by PPR 3 days before the planned flight. Flight fuel limits from UIBB aerodrome for regular air carriers depend on the destination aerodrome and are specified for UIII, UNNT, UEMO, UECT, UWUU, USNN, UUDD, USTR, and UELL.