New runway construction is underway on the west side of the aerodrome, parallel to the existing runway.
2025-07-16 08:00 - 2025-10-17 08:00
Period of Applicability
2025-07-16 08:00 - 2025-10-17 08:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Work in progress on the west side of the aerodrome due to new runway construction parallel to the existing runway, located 250 meters between the center lines. Construction equipment may operate up to 5 meters in height.
Message
WIP ON WEST SIDE OF AD: NEW RWY CONSTRUCTION IN PARALLEL TO EXISTING RWY AT DIST 250M (BTN CENTRE LINES). CONST EQPT UP TO 5M OPR.