Excavation work in progress near runway 14/32 affecting operations.
2025-03-11 14:39 - 2025-06-12 23:59
Period of Applicability
2025-03-11 14:39 - 2025-06-12 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, cancel anytime
Interpretation
Excavation work in progress on both sides of runway 14/32 at a distance of 45 meters or more from the runway centerline. Equipment height is up to 3 meters during aircraft takeoff and landing, and equipment will be removed during these operations.
Message
RWY 14/32: EXCAVATION WIP ON BOTH RWY SIDES AT DIST 45M AND MORE FROM RCL. EQPT HGT UP TO 3M OPR, DRG ACFT TKOF/LDG EQPT REMOVED.